Project information
Study on the disturbance occurred in Argüelles substation of June 22, 2010
December 2010 - December 2010
Funding entity Iberdrola Distribución Eléctrica
This proyect has studied the disturbance ocurred on Majadahonda substation of June 22, 2010.
Research topics:
- *Steady-state: Load flows, analysis of power system constraints, optimal load flows, voltage control ancilliary service,short-circuits, protections in transmission and ditribution networks
IberdrolaMajadahonda